Planning – Application Summary

Help with this page (opens in a new window)

2022/1700/LBC | Construction of a new pontoon, consisting of: a steel bridgehead platform with GRP mesh decking fixed to the wall; 4no. connected glassfibre concrete deck pontoons which rise up and down, 4no. steel vertical guide columns and a hinged steel bridge with GRP mesh decking linking the two, guardrails and gates to the edge of the quayside and the bridgehead platform of stainless steel; and around the pontoons of galvanised steel, 5m high aluminium lighting columns and safety and rescue aids (application for Listed Building Consent) | River Tawe Quay Of Former Hafod Copperworks Swansea Approve
  • Print summary icon
Received
Thu 14 Jul 2022
Validated
Thu 14 Jul 2022
Consultation
Tue 06 Sep 2022
Recommendation and/or Committee
Committee: Tue 06 Sep 2022
Decided
Wed 19 Oct 2022
Reference 2022/1700/LBC
Alternative Reference PP-11395869
Application Received Thu 14 Jul 2022
Application Validated Thu 14 Jul 2022
Address River Tawe Quay Of Former Hafod Copperworks Swansea
Proposal Construction of a new pontoon, consisting of: a steel bridgehead platform with GRP mesh decking fixed to the wall; 4no. connected glassfibre concrete deck pontoons which rise up and down, 4no. steel vertical guide columns and a hinged steel bridge with GRP mesh decking linking the two, guardrails and gates to the edge of the quayside and the bridgehead platform of stainless steel; and around the pontoons of galvanised steel, 5m high aluminium lighting columns and safety and rescue aids (application for Listed Building Consent)
Status Decided
Decision Approve
Decision Issued Date Wed 19 Oct 2022
Appeal Status Unknown
Appeal Decision Not Available

There are 40 documents associated with this application.

There is 1 case associated with this application.

There is 1 property associated with this application.

Powered by Idox